11

2023

-

11

Tee connection method

Author:


1. Broken pipe
According to the on-site surveying and mapping sketch, connect the selected pipes to the national line and cut them according to the line
2. Threading
Thread the broken pipe in stages according to the pipe diameter size. Generally, threading should be done twice for pipes with a diameter of 15-32mm, three times for pipes with a diameter of 40-50mm, and 3-4 times for pipes with a diameter of 70mm or more
3. Fitting fittings
According to the on-site surveying sketch, assemble the threaded pipes and fittings.
4. Pipe section straightening
Straighten the installed pipe section before installation. It is not allowed to damage the pipe section during straightening.

Hotline:

+8613566267236

Address: No.28 -2, Yangliu Road, Xinghai Street, Wenzhou City, Zhejiang Province

Mobile:+8613566267236

Mailbox:yt@chinahongwang.com

Contact: Yang Zong

Copyright©2023 Zhejiang Hongwang Valve Fittings Co., Ltd. www.300.cn SEO

Business License